A utility needs recovery capability that can be moved to wherever the disruption occurs. Which option does NIST SP 800-34 describe, and what is its practical timing?

  1. A cold site, which can be established anywhere within 24 hours.
  2. A reciprocal agreement, which allows relocation to a partner within 24 hours.
  3. A mobile site, a transportable shell fitted with the needed equipment, often deliverable within 24 hours though installation adds to that.
  4. A mirrored site, which follows the workload to any location automatically.
Show the answer

Answer: C. A mobile site, a transportable shell fitted with the needed equipment, often deliverable within 24 hours though installation adds to that.

Mobile sites are self-contained transportable shells custom-fitted with the telecommunications and system equipment needed; they may be delivered within 24 hours, though equipment installation and setup increase that.

Source: NIST SP 800-34 Rev. 1 (NIST) — SP 800-34 Rev. 1 > 3.4.3 Alternate Site